PowerReady Incentive Dashboard
-
Last updated October 20, 2026
Current Incentive Caps
Please note that your eligibility tier provides the maximum incentive amount; your actual incentive will be determined in the Program Agreement (PA) stage, after you have received your energy service ruling. The incentive amount will vary depending on the maximum incentive eligibility level, total site costs, program budgets, and the general competitiveness of the project when compared to other projects.
Level 2 Plug Cost Caps
Incentive Cap for Program Eligible Costs (Customer + Potential Utility Costs; All values shown are “Up to”)
|
Incentive Tier |
Base Cost |
Speed Bonus |
Large Project Bonus |
Max Available |
Future Proofing |
|---|---|---|---|---|---|
|
Up to 50% |
$5,000/per plug |
$1,000/per plug |
$1,500/per plug |
$7,500/per plug |
10% of eligible costs |
|
Up to 90% |
$9,000/per plug |
$1,800/per plug |
$2,700/per plug |
$13,500/per plug |
10% of eligible costs |
|
Up to 100% |
$10,000/per plug |
$2,000/per plug |
$3,000/per plug** |
$15,000/per plug |
10% of eligible costs |
Base Cost
Cap
$5,000/per plug
Speed Bonus
$1,000/per plug
Large Project Bonus
(25+ plugs)*
$1,500/per plug
Max Available
Cost Cap
$7,500/per plug
Future Proofing
Bonus
10% of eligible costs
Base Cost
Cap
$9,000/per plug
Speed Bonus
$1,800/per plug
Large Project Bonus
(25+ plugs)*
$2,700/per plug
Max Available
Cost Cap
$13,500/per plug
Future Proofing
Bonus
10% of eligible costs
Base Cost
Cap
$10,000/per plug
Speed Bonus
$2,000/per plug
Large Project Bonus
(25+ plugs)*
$3,000/per plug**
Max Available
Cost Cap
$15,000/per plug
Future Proofing
Bonus
10% of eligible costs
*Large Project Bonus – Project must be 25 plugs or more, can only be applied to the first 100 plugs.
**The 25-plug minimum is waived for this tier (up to the first 100 plugs).
DCFC kW Cost Caps
Incentive Cap for Program Eligible Costs (Customer + Potential Utility Costs; All values shown are “Up to”)
|
Incentive Tier |
Base Cost Cap |
Speed Bonus* |
Load Mgmt Bonus** |
Max Available Cap |
Charger Hub |
Max Available Cost Cap |
Future Proofing Bonus |
|---|---|---|---|---|---|---|---|
|
Up to 50% |
$400/kW |
$50/kW |
$25/kW |
$475/kW |
N/A |
N/A |
10% of eligible costs |
|
Up to 90% |
$720/kW |
$90/kW |
$45/kW |
$855/kW |
$225/kW |
$945/kW |
10% of eligible costs |
|
Up to 100% |
$800/kW |
$100/kW |
$50/kW |
$950/kW |
$250/kW |
$1,050/kW |
10% of eligible costs |
Base Cost Cap
$400/kW
Speed Bonus*
$50/kW
Load Mgmt Bonus**
$25/kW
Max Available Cap
$475/kW
Charger Hub
Path Bonus***
N/A
Max Available Cost Cap
N/A
Future Proofing Bonus
10% of eligible costs
Base Cost Cap
$720/kW
Speed Bonus*
$90/kW
Load Mgmt Bonus**
$45/kW
Max Available Cap
$855/kW
Charger Hub
Path Bonus***
$225/kW
Max Available Cost Cap
$945/kW
Future Proofing Bonus
10% of eligible costs
Base Cost Cap
$800/kW
Speed Bonus*
$100/kW
Load Mgmt Bonus**
$50/kW
Max Available Cap
$950/kW
Charger Hub
Path Bonus***
$250/kW
Max Available Cost Cap
$1,050/kW
Future Proofing Bonus
10% of eligible costs
*Speed Bonus: If installing a L2 project, your project needs to complete a successful work verification within 4 months of signing the Program Agreement. If installing a DCFC/Mixed plug project, your project needs to be ruled “Service Adequate” and must complete work verification within 6 months of signing the Program Agreement. Cannot be combined with Interconnection bonus.
**Load Management Bonus: Participants must install Hardware Load Management equipment (e.g., disconnect switches, relays, rectifiers, circuit breakers, power cabinets) to qualify for the bonus. DCFC plugs must maintain a minimum output of 50 kW after load reduction. This bonus may be paired with Speed Bonus if service adequate.
***Interconnection Bonus: Service Inadequate/ Public 10+. Must have significant interconnection costs such as new service or block house. Cannot be combined with any other bonus.
|
Waitlist Status |
|
|---|---|
|
L2 Disadvantaged Community (DAC) waitlist |
We are currently working through the waitlist of active projects that applied for the “up to 100%” incentive tier. We are currently not accepting any additional projects for this waitlist. |
|
L2 General Program Timed Release |
We are currently committing projects up to our regulatory target (approximately 21,000 L2 plugs). We are currently accepting new projects and applications will proceed off the standby list on a monthly basis. |
|
DCFC general program waitlist |
No waitlist |
|
Plug Pipeline |
Installed |
Validation |
Committed |
In Pipeline |
Stand-By |
Not Yet Applied |
2026 Target |
|---|---|---|---|---|---|---|---|
|
All L2 |
17,720 |
1,620 |
1,630 |
18,610 |
0 |
0 |
21,371 |
|
Up to 50% |
10,020 |
680 |
730 |
7,510 |
|
|
|
|
Up to 90% |
4,900 |
890 |
720 |
5,080 |
|
|
|
|
Up to 100% |
2,700 |
0 |
170 |
220 |
|
|
|
|
Mixed Tier |
100 |
50 |
10 |
5,800 |
|
|
|
Installed
17,720
Validation
1,620
Committed
1,630
In Pipeline
18,610
Stand-By
0
Not Yet Applied
0
2026 Target
21,371
Installed
10,020
Validation
680
Committed
730
In Pipeline
7,510
Installed
4,900
Validation
890
Committed
720
In Pipeline
5,080
Installed
2,700
Validation
0
Committed
170
In Pipeline
220
Installed
100
Validation
50
Committed
10
In Pipeline
5,800
|
Plug Pipeline |
Installed |
Validation |
Committed |
In Pipeline |
Stand-By |
Not Yet Applied |
2026 Target |
|---|---|---|---|---|---|---|---|
|
All DCFC |
820 |
100 |
770 |
3,270 |
0 |
0 |
3,127 |
|
Up to 50% |
380 |
30 |
90 |
70 |
|
|
|
|
Up to 90% |
200 |
40 |
320 |
1,020 |
|
|
|
|
Up to 100% |
210 |
20 |
350 |
570 |
|
|
|
|
Mixed Tier |
30 |
10 |
0 |
1,620 |
|
|
|
Installed
820
Validation
100
Committed
770
In Pipeline
3,270
Stand-By
0
Not Yet Applied
0
2026 Target
3,127
Installed
380
Validation
30
Committed
90
In Pipeline
70
Installed
200
Validation
40
Committed
320
In Pipeline
1,020
Installed
210
Validation
20
Committed
350
In Pipeline
570
Installed
30
Validation
10
Committed
0
In Pipeline
1,620
Installed includes both completed projects and projects notified as fully installed by participant, but not yet validated by Con Edison.
*Values are rounded to the nearest 10 plugs
|
Budget Pipeline ($M) |
Installed |
Validation |
Committed |
Complete |
Estimated In Pipeline** |
Not Yet Applied*** |
2026 Budget |
|---|---|---|---|---|---|---|---|
|
L2 Funds |
$168.90 |
$15.10 |
$13.50 |
$104.20 |
$0.00 |
$237.80 |
$21,371 |
|
Up to 50% |
$68.50 |
$4.00 |
$4.70 |
$46.10 |
|
|
|
|
Up to 90% |
$58.40 |
$10.00 |
$6.60 |
$55.50 |
|
|
|
|
Up to 100% |
$40.90 |
$0.00 |
$2.00 |
$2.60 |
|
|
|
|
Mixed Tier |
$1.10 |
$1.10 |
$0.10 |
$0.00 |
|
|
|
Installed
$168.90
Validation
$15.10
Committed
$13.50
Complete
$104.20
Estimated In Pipeline**
$0.00
Not Yet Applied***
$237.80
2026 Budget
$21,371
Installed
$68.50
Validation
$4.00
Committed
$4.70
Complete
$46.10
Installed
$58.40
Validation
$10.00
Committed
$6.60
Complete
$55.50
Installed
$40.90
Validation
$0.00
Committed
$2.00
Complete
$2.60
Installed
$1.10
Validation
$1.10
Committed
$0.10
Complete
$0.00
|
Budget Pipeline ($M) |
Installed |
Validation |
Committed |
Complete |
2026 Budget |
|---|---|---|---|---|---|
|
DCFC Funds |
$31.90 |
$8.10 |
$70.00 |
$69.00 |
$347.20 |
|
Up to 50% |
$7.00 |
$0.90 |
$2.00 |
$3.10 |
|
|
Up to 90% |
$11.40 |
$4.90 |
$26.80 |
$114.60 |
|
|
Up to 100% |
$12.80 |
$1.60 |
$38.90 |
$90.50 |
|
|
Mixed Tier |
$0.70 |
$0.70 |
$0.20 |
$0.00 |
|
Installed
$31.90
Validation
$8.10
Committed
$70.00
Complete
$69.00
2026 Budget
$347.20
Installed
$7.00
Validation
$0.90
Committed
$2.00
Complete
$3.10
Installed
$11.40
Validation
$4.90
Committed
$26.80
Complete
$114.60
Installed
$12.80
Validation
$1.60
Committed
$38.90
Complete
$90.50
Installed
$0.70
Validation
$0.70
Committed
$0.20
Complete
$0.00
Installed includes all funds that are committed, including projects that are paid out and projects to which Con Edison has committed funds via signed Payment Agreements.
* Funds committed to projects not yet installed are subject to change once incentives are finalized and paid out.
**Estimate of funds it would take to incentivize all plugs in the pipeline, including the wait list, and this value may exceed the program authorized budget.