PowerReady Incentive Dashboard

Get information on current incentive levels and program progress to goal. Details updated monthly. 

Current Incentive Caps

Please note that your eligibility tier provides the maximum incentive amount; your actual incentive will be determined in the Program Agreement (PA) stage, after you have received your energy service ruling. The incentive amount will vary depending on the maximum incentive eligibility level, total site costs, program budgets, and the general competitiveness of the project when compared to other projects.

Level 2 Plug Cost Caps

Incentive Cap for Program Eligible Costs (Customer + Potential Utility Costs; All values shown are “Up to”)

Incentive Tier

Base Cost
Cap

Speed Bonus

Large Project Bonus
(25+ plugs)*

Max Available
Cost Cap

Future Proofing
Bonus

Up to 50%

$5,000/per plug

$1,000/per plug

$1,500/per plug

$7,500/per plug

10% of eligible costs

Up to 90%

$9,000/per plug

$1,800/per plug

$2,700/per plug

$13,500/per plug

10% of eligible costs

Up to 100%

$10,000/per plug

$2,000/per plug

$3,000/per plug**

$15,000/per plug

10% of eligible costs

Base Cost
Cap

$5,000/per plug

Speed Bonus
$1,000/per plug

Large Project Bonus
(25+ plugs)*

$1,500/per plug

Max Available
Cost Cap

$7,500/per plug

Future Proofing
Bonus

10% of eligible costs

Base Cost
Cap

$9,000/per plug

Speed Bonus
$1,800/per plug

Large Project Bonus
(25+ plugs)*

$2,700/per plug

Max Available
Cost Cap

$13,500/per plug

Future Proofing
Bonus

10% of eligible costs

Base Cost
Cap

$10,000/per plug

Speed Bonus
$2,000/per plug

Large Project Bonus
(25+ plugs)*

$3,000/per plug**

Max Available
Cost Cap

$15,000/per plug

Future Proofing
Bonus

10% of eligible costs

*Large Project Bonus – Project must be 25 plugs or more, can only be applied to the first 100 plugs.
**The 25-plug minimum is waived for this tier (up to the first 100 plugs).

DCFC kW Cost Caps

Incentive Cap for Program Eligible Costs (Customer + Potential Utility Costs; All values shown are “Up to”)

Incentive Tier

Base Cost Cap

Speed Bonus*

Load Mgmt Bonus**

Max Available Cap

Charger Hub
Path Bonus***

Max Available Cost Cap

Future Proofing Bonus

Up to 50%

$400/kW

$50/kW

$25/kW

$475/kW

N/A

N/A

10% of eligible costs

Up to 90%

$720/kW

$90/kW

$45/kW

$855/kW

$225/kW

$945/kW

10% of eligible costs

Up to 100%

$800/kW

$100/kW

$50/kW

$950/kW

$250/kW

$1,050/kW

10% of eligible costs

Base Cost Cap
$400/kW

Speed Bonus*
$50/kW

Load Mgmt Bonus**
$25/kW

Max Available Cap
$475/kW

Charger Hub
Path Bonus***

N/A

Max Available Cost Cap
N/A

Future Proofing Bonus
10% of eligible costs

Base Cost Cap
$720/kW

Speed Bonus*
$90/kW

Load Mgmt Bonus**
$45/kW

Max Available Cap
$855/kW

Charger Hub
Path Bonus***

$225/kW

Max Available Cost Cap
$945/kW

Future Proofing Bonus
10% of eligible costs

Base Cost Cap
$800/kW

Speed Bonus*
$100/kW

Load Mgmt Bonus**
$50/kW

Max Available Cap
$950/kW

Charger Hub
Path Bonus***

$250/kW

Max Available Cost Cap
$1,050/kW

Future Proofing Bonus
10% of eligible costs

*Speed Bonus: If installing a L2 project, your project needs to complete a successful work verification within 4 months of signing the Program Agreement. If installing a DCFC/Mixed plug project, your project needs to be ruled “Service Adequate” and must complete work verification within 6 months of signing the Program Agreement. Cannot be combined with Interconnection bonus.
**Load Management Bonus: Participants must install Hardware Load Management equipment (e.g., disconnect switches, relays, rectifiers, circuit breakers, power cabinets) to qualify for the bonus. DCFC plugs must maintain a minimum output of 50 kW after load reduction. This bonus may be paired with Speed Bonus if service adequate.
***Interconnection Bonus: Service Inadequate/ Public 10+. Must have significant interconnection costs such as new service or block house. Cannot be combined with any other bonus.

Waitlist Status

L2 Disadvantaged Community (DAC) waitlist

We are currently working through the waitlist of active projects that applied for the “up to 100%” incentive tier. We are currently not accepting any additional projects for this waitlist.

L2 General Program Timed Release

We are currently committing projects up to our regulatory target (approximately 21,000 L2 plugs). We are currently accepting new projects and applications will proceed off the standby list on a monthly basis.

DCFC general program waitlist

No waitlist

Plug Pipeline

Installed  

Validation  

Committed  

In Pipeline

Stand-By

Not Yet Applied

2026 Target

All L2

17,720

1,620

1,630

18,610

0

0

21,371

Up to 50%

10,020

680

730

7,510

Up to 90%

4,900

890

720

5,080

Up to 100%

2,700

0

170

220

Mixed Tier

100

50

10

5,800

Installed  
17,720

Validation  
1,620

Committed  
1,630

In Pipeline
18,610

Stand-By
0

Not Yet Applied
0

2026 Target
21,371

Installed  
10,020

Validation  
680

Committed  
730

In Pipeline
7,510

Installed  
4,900

Validation  
890

Committed  
720

In Pipeline
5,080

Installed  
2,700

Validation  
0

Committed  
170

In Pipeline
220

Installed  
100

Validation  
50

Committed  
10

In Pipeline
5,800

Plug Pipeline

Installed  

Validation  

Committed  

In Pipeline

Stand-By

Not Yet Applied

2026 Target

All DCFC

820

100

770

3,270

0

0

3,127

Up to 50%

380

30

90

70

Up to 90%

200

40

320

1,020

Up to 100%

210

20

350

570

Mixed Tier

30

10

0

1,620

Installed  
820

Validation  
100

Committed  
770

In Pipeline
3,270

Stand-By
0

Not Yet Applied
0

2026 Target
3,127

Installed  
380

Validation  
30

Committed  
90

In Pipeline
70

Installed  
200

Validation  
40

Committed  
320

In Pipeline
1,020

Installed  
210

Validation  
20

Committed  
350

In Pipeline
570

Installed  
30

Validation  
10

Committed  
0

In Pipeline
1,620

Installed includes both completed projects and projects notified as fully installed by participant, but not yet validated by Con Edison.
*Values are rounded to the nearest 10 plugs

Budget Pipeline ($M)

Installed  

Validation  

Committed  

Complete    

Estimated In Pipeline**

Not Yet Applied***

2026 Budget

L2 Funds

$168.90

$15.10

$13.50

$104.20

$0.00

$237.80

$21,371

Up to 50%

$68.50

$4.00

$4.70

$46.10

Up to 90%

$58.40

$10.00

$6.60

$55.50

Up to 100%

$40.90

$0.00

$2.00

$2.60

Mixed Tier

$1.10

$1.10

$0.10

$0.00

Installed  
$168.90

Validation  
$15.10

Committed  
$13.50

Complete    
$104.20

Estimated In Pipeline**
$0.00

Not Yet Applied***
$237.80

2026 Budget
$21,371

Installed  
$68.50

Validation  
$4.00

Committed  
$4.70

Complete    
$46.10

Installed  
$58.40

Validation  
$10.00

Committed  
$6.60

Complete    
$55.50

Installed  
$40.90

Validation  
$0.00

Committed  
$2.00

Complete    
$2.60

Installed  
$1.10

Validation  
$1.10

Committed  
$0.10

Complete    
$0.00

Budget Pipeline ($M)

Installed  

Validation  

Committed  

Complete    

2026 Budget

DCFC Funds

$31.90

$8.10

$70.00

$69.00

$347.20

Up to 50%

$7.00

$0.90

$2.00

$3.10

Up to 90%

$11.40

$4.90

$26.80

$114.60

Up to 100%

$12.80

$1.60

$38.90

$90.50

Mixed Tier

$0.70

$0.70

$0.20

$0.00

Installed  
$31.90

Validation  
$8.10

Committed  
$70.00

Complete    
$69.00

2026 Budget
$347.20

Installed  
$7.00

Validation  
$0.90

Committed  
$2.00

Complete    
$3.10

Installed  
$11.40

Validation  
$4.90

Committed  
$26.80

Complete    
$114.60

Installed  
$12.80

Validation  
$1.60

Committed  
$38.90

Complete    
$90.50

Installed  
$0.70

Validation  
$0.70

Committed  
$0.20

Complete    
$0.00

Installed includes all funds that are committed, including projects that are paid out and projects to which Con Edison has committed funds via signed Payment Agreements.
* Funds committed to projects not yet installed are subject to change once incentives are finalized and paid out.
**Estimate of funds it would take to incentivize all plugs in the pipeline, including the wait list, and this value may exceed the program authorized budget.
*** Not yet applied captures the estimated budget available if all applied projects were to be installed. Some applied projects will not move forward so interested participants are encouraged to apply since additional budget may be available.