Skip to Main Content
ajax loader animation
ajax loader animation

Incentives for Installing EV Charging Stations in Disadvantaged Communities

Receive incentives that may cover a higher percentage of energy company and customer costs when you install charging stations that benefit designated disadvantaged communities in New York City and Westchester.

Disadvantaged communities (DAC) bear disproportionate burdens of the impacts of climate change and possess certain socioeconomic criteria or comprise high concentrations of low- and moderate-income households.

This definition was adopted by the Climate Justice Working Group (CJWG) under the direction of the Climate Leadership & Community Protection Act (CLCPA), on March 27, 2023. An updated map reflecting the CJWG’s final definition is available via New York State’s CJWG website and on this page.

Projects benefiting DAC are defined by location, setting (e.g., curbside or at a multi-unit dwelling (MUD)), by program (e.g., PowerReady, Micromobility, and Medium-and-Heavy-Duty Pilot, and/or by plug type

Back to top

PowerReady Program

Requirement

DCFC

L2 Curbside

L2 MUD

PowerReady Program

Requirement

Publicly Accessible and Within DAC

DCFC

X

L2 Curbside

X

L2 MUD

PowerReady Program

Requirement

MUD w/ 25% units at, or below, 80% AMI

DCFC

L2 Curbside

L2 MUD

X

PowerReady Program

Requirement

Incentive Tier

DCFC

Up to 100%

L2 Curbside

Up to 100%

L2 MUD

Up to 100%

Back to top

Micromobility Program

Requirement

MUD

Non-MUD

Micromobility Program

Requirement

Publicly Accessible
and Within DAC

MUD

Non-MUD

X

Micromobility Program

Requirement

MUD w/ 25% units at, or below, 80% AMI

MUD

X

Non-MUD

Micromobility Program

Requirement

Incentive Tier

MUD

Up to 50% on CSC*; Up to 100% for USC**

Non-MUD

Up to 50% on CSC; Up to 100% for USC

Back to top

Medium-and-Heavy-Duty Pilot Program

Tier

Customer-Side

Utility-Side

Medium-and-Heavy-Duty Pilot Program

Publicly Accessible or Shared Sites

Tier

Tier 1: In a DAC

Customer-Side

Up to 90% of costs or $882/kW cap

Utility-Side

Up to 90% of costs

Medium-and-Heavy-Duty Pilot Program

Publicly Accessible or Shared Sites

Tier

Tier 2: Not in a DAC

Customer-Side

Up to 50% of costs or $490/kW cap

Utility-Side

Up to 90% of costs

Medium-and-Heavy-Duty Pilot Program

Private Sites

Tier

Tier 1: In a DAC

Customer-Side

Up to 90% of costs or $882/kW cap

Utility-Side

Up to 90% of costs

Medium-and-Heavy-Duty Pilot Program

Private Sites

Tier

Tier 2: Within 2-mile radius of a DAC

Customer-Side

Up to 50% of costs or $490/kW cap

Utility-Side

Up to 90% of costs

Medium-and-Heavy-Duty Pilot Program

Private Sites

Tier

Tier 3: Not within 2-mile radius of a DAC

Customer-Side

Not eligibile

Utility-Side

Up to 90% of costs

Back to top

PowerReady Eligibility:

  • DCFC Public Chargers: Located within a DAC and publicly accessible.
  • L2 Public Curbside Chargers: Located on the curb, within or adjacent to a DAC and publicly accessible.
  • L2 Chargers at MUDs: Parking garages and lots at apartment buildings with five or more units anywhere in Con Edison’s service territory where 25% of units are at, or below, 80% of state median income or area median income (AMI), whichever is higher. The AMI data source is the U.S. Department of Housing and Urban Development.

Micromobility Eligibility:

  • Publicly accessible chargers located within a DAC.
  • Chargers located in, or adjacent to, an eligible multi-unit dwelling. Eligible multi-unit dwellings are apartment buildings with five or more units anywhere in the service territory where 25% of units are at, or below, 80% of state median income or area median income (AMI), whichever is higher.

Medium-and Heavy-Duty Vehicle (MHDV) Pilot Program:

  • Chargers must be supporting medium-duty or heavy-duty vehicles (class 3 or above; over 10,000 lbs GVWR) or non-road vehicles/equipment (a vehicle voucher is no longer required to be eligible)
  • Private sites located within a Disadvantaged Community (DAC) or within 2 miles of a DAC are eligible for customer and utility-side incentives. Private sites outside of 2 miles are eligible for utility-side incentives only
  • Public or shared hub sites are eligible for customer and utility-side incentives
  • Use our map to check if your location is in or within two miles of a DAC. View map.
  • Get more information on incentive levels and eligibility. Go Now.
Back to top

Disadvantaged Communities Map

Back to top

If you’re not sure if your site is located in a DAC, please:

  • Watch the video tutorial on the Hosting Capacity and System Data Map page
  • Open the Hosting Capacity Web Application and select the “Electrification (Formerly EV Charging)” tab
  • Select the blue “Layer List” icon
  • Select the “Disadvantaged Communities” layer by checking the corresponding check box
  • Type in your site address to determine if the address is located within the gray-shaded area that represents the DAC area
    Back to top

    * Customer Side Cost (CSC)

    ** Utility Side Cost (USC)